National Institute for Aviation Research -
 
   
  NCAMP Documents: Standard Operating Procedures



Home

AGATE
database

Bulletin

History

Members

Portal

Allowables & Specs

Additional Documents

 

 

Date

Type

Documents

Author

Contact

March 27, 2017

PDF

Polyacrylonitrile-Based Carbon Fiber Process Control Document (PCD) Preparation and Maintenance Guide



Yeow Ng

Sept. 20, 2010

PDF

FAA Memorandum

Mark Freisthler

Yeow Ng

Aug. 11, 2010 PDF NCAMP Authorized Engineering Representative (AER) Qualification Plan (NCAMP Document No. NQP 200) Yeow Ng Yeow Ng
March 11, 2010 PDF Instruction Guide for NCAMP Form 289-3 Engineering Acceptance   Yeow Ng
March 11, 2010 PDF NCAMP Authorized Inspection Representative (AIR) Qualification Plan
(NCAMP Document No. NQP 100)
  Yeow Ng
March 11,2010 PDF NCAMP Standard Operating Procedures (Document No. NSP 100) Yeow Ng, John Tomblin Yeow Ng
March 11, 2010 Word NCAMP Form 289-3 Engineering Acceptance   Yeow Ng
March 11, 2010 Word NCAMP Form 168-10 Request for Inspection Verification   Yeow Ng
March 11, 2010 PDF Instruction Guide for NCAMP 168-10 Request for Inspection Verification   Yeow Ng
March 11, 2010 Word NCAMP Form 168-1 Inspection Verification Record   Yeow Ng
March 11, 2010 PDF Instruction Guide for NCAMP Form 168-1 Inspection Verification Record   Yeow Ng
Dec. 22, 2009 PDF Operating Procedures & Bylaw for NCAMP Suppliers Advisory Board (SAB) Document No. NSP 130   Yeow Ng
Dec. 22, 2009 PDF Document Number: NSP 120
Operating Procedures and Bylaws for NCAMP Manufacturers Advisory Board (MAB)
Yeow Ng Yeow Ng
Dec. 22,2009 PDF Document Number: NSP 110
Operating Procedures and Bylaws for NCAMP Regulatory Governing Board (RGB)
Yeow Ng Yeow Ng
February 2008 PDF NCAMP Prepreg PCD Preparation & Maintenance Guide Rev. B Yeow Ng Yeow Ng

 

Wichita State University
Site Search Site Search